
			<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
			<channel>
			<atom:link href="https://www.abpempower.in/" rel="self" type="application/rss+xml" />
			<title>Vacancy</title>
			<link>https://www.abpempower.in</link>
			<description>Vacancy</description>
			<lastBuildDate>Mon, 09 Nov 2026 00:35:25 +0530</lastBuildDate>
			<language>en-us</language>
			<generator>https://www.abpempower.in</generator>
				<item>
				<title>Production Incharge (Male)</title>
				<link>https://www.abpempower.in/job-openings-for-production-incharge-ludhiana-1452895.htm</link>
				<guid>https://www.abpempower.in/job-openings-for-production-incharge-ludhiana-1452895.htm</guid>
				<pubDate>Tue, 11 Aug 2026 00:00:00 +0530</pubDate>
				<description>1. MANPOWER MANAGEMENT &amp; MANPOWER COST (MAIN FOCUS)
•	Decide the right number of workers needed for each machine and each line to meet the daily target - not more, not less.
•	Reduce the number of workers used per shift wherever possible, without reducing production.
•	Track manpower cost every day and compare it to production output - the goal is maximum output per worker, at the lowest manpower cost.
•	Cut overtime hours by planning and managing manpower better.
•	Work towards removing the night shift completely, by making day and evening shifts efficient enough to cover the full target.
•	Train workers to handle more than one machine or job, so fewer workers can run more stations.
•	Remove unnecessary manpower stages - any point in the process where extra workers are placed but not adding real value.
•	Handle attendance, shift roster, and daily manpower deployment across the shop floor.
•	Train supervisors and line in-charges to run their line independently, with the least number of workers, without dropping output or quality.
2. PRODUCTION PLANNING
•	Make the daily, weekly, and monthly production plan for press shop, pipe bending, welding, and fabrication.
•	Make sure material planning is done on time - no line should stop because material was not ready.
•	Set the priority of jobs (which order to run) based on customer requirement and dispatch plan.
•	Break the plan into hour-by-hour targets for each machine, not just a shift-end number.
3. LINE BALANCING &amp; EFFICIENCY
•	Balance manpower and machines on each line so that no worker or machine sits idle.
•	Remove bottlenecks that slow down the full line.
•	Find out why night shifts and low-efficiency shifts are happening, and fix the reason permanently.
4. PRODUCTION COST REDUCTION
•	Reduce cost per part, with manpower cost as the main lever.
•	Reduce scrap, rework, and rejection through better process discipline.
•	Find and implement cost-saving ideas on the shop floor - consumables, power, tooling, changeover time.
5. DAILY REPORTING
•	Give hourly production reports for every machine - output against target.
•	Give daily downtime reports - which machine stopped, for how long, and why.
•	Give breakdown reports - when it happened, when it was fixed, and the reason.
•	Reports should be quick and clear, so problems are caught the same shift, not the next day.
6. KAIZEN (CONTINUOUS IMPROVEMENT)
•	Run regular Kaizen activities on the floor to improve cycle time, layout, and material flow.
•	Keep a simple running list of improvements raised and closed.
7. PROBLEM SOLVING
•	Walk the shop floor daily to catch problems that reports may not show - idle time, small stoppages, wasted movement.
•	Find the root cause of repeat problems (breakdowns, low-efficiency shifts, rejections) and fix them permanently, not temporarily.
•	Inform the Plant Head about any issue that needs support beyond the shop floor.</description>
				</item>
			</channel>
			</rss>